This page was created as a resource of available studies of different sites. The resources on this page will be updated as additional information becomes available.
Division Wide – All APS | Abingdon | Alice W. Fleet | Arlington Science Focus | Ashlawn | ATS | Barcroft | Barrett | Campbell | Career Center | Carlin Springs | Discovery | Dorothy Hamm | Dr. Charles R. Drew | Education Center | Glebe | Gunston | Henry | Hoffman-Boston | Jamestown | Jefferson | Kenmore | Long Branch | McKinley | Nottingham | Oakridge | Planetarium | Randolph | Reed/Cardinal | Swanson | Taylor | Williamsburg | Multiple APS Sites
Lubber Run Community Center | Madison Community Center | Quincy Site
Additional Planning Resources Page
APS – 2021 – Compiled Site Data by Zone Spreadsheet
- This is a working document that will be used to capture data on sites for APS.
- Data points were identified by APS constituent groups.
- When applicable information was available in existing site studies, it was captured in this file.
- This file will be updated to include additional information as additional data becomes available.
APS – 2019 – Design Studies per School Board CIP Direction
This includes cost estimates only for the following locations:
- The Heights Building
- Virginia Hospital Center Temporary Swing Space for Elementary School
- Trades Center Expand Bus Parking
- New Elementary School Location TBD
Potential Sites – 2019 – County Manager’s Letter to Superintendent
South Arlington Work Group (SAWG) – 2016
APS – 2014 – Divisionwide Utilization and Occupancy Study
Abingdon – 2014 – Conceptual Design/Feasibility Cost Estimate Report
Abingdon – 2011 – Programmatic Cost Estimate
Additional information is available in the Multiple Sites section below.
Arlington Science Focus (2017, 2014)
Arlington Science Focus – 2017 – Feasibility Study
Arlington Science Focus – 2014 – Dirt Room Narrative
Arlington Science Focus – 2014 – Dirt Room Study
Ashlawn – 2011 – Conceptual Design / Feasibility Cost Estimate Report
Ashlawn – 2006 – Building Information Report
Arlington Traditional (New Key Site) (2019, 2014, 2011)
APS – 2019 – Design Studies per School Board CIP Direction
Arlington Traditional – 2014 – Preliminary Scheme
Arlington Traditional – 2011 – Site Plans
Arlington Traditional – 2011 – Design Study
Arlington Traditional – 2011 – Conceptual Design/Feasibility Cost Estimate Report
APS – 2019 – Design Studies per School Board CIP Direction
Barcroft – 2014 – Conceptual Design/Feasibility Cost Estimate Report
Barcroft – 2014 – Preliminary Scheme
Barcroft – 2006 – Building Information Report
Barrett – 2006 – Building Information Report
Barrett – 2006 – Supporting Documentation
APS – 2019 – Design Studies per School Board CIP Direction
Campbell – 2014 – Preliminary Scheme
Campbell – 2014 – Conceptual Design/Feasibility Cost Estimate Report
Career Center-Arlington Community-Montessori (Formerly Henry) (2016, 2014, 2013, 2011, 2008, 2007, 2006)
Career Center – 2016 – Geotechnical Engineering Report
Career Center – 2014 – Feasibility Cost Estimate Report
Career Center – 2014 – Feasibility Study – High School Update
Career Center – 2014 – Parking Options Study
Career Center – 2013 – Feasibility Study
Career Center/Arlington Mill – 2011 – Program/Utilization Study
Career Center – 2008 – Presentation (Based on 2007 Feasibility Study)
Career Center – 2008 – BLPC Presentation (Based on 2007 Feasibility Study)
Career Center – 2007 Feasibility Study
Montessori (Henry) – 2014 – Diagrams
Montessori (Henry) – 2006 – Building Information Report
Dorothy Hamm (Formerly HB Woodlawn) (2014, 2006)
Dorothy Hamm (HB Woodlawn) – 2014 – Site Diagrams
Dorothy Hamm (HB Woodlawn) – 2014 – Option 2 Diagrams
Dorothy Hamm (HB Woodlawn) – 2014 – Option 3 Diagrams
Dorothy Hamm (HB Woodlawn) – 2014 – Conceptual Design/Feasibility Cost Estimate Report
Dorothy Hamm (HB Woodlawn) – 2006 – Building Information Report
Dr. Charles R. Drew (2014, 2011)
Dr, Charles R. Drew – 2014 – Conceptual Design/Feasibility Cost Estimate Report
Dr.Charles R. Drew – 2011 – Option 1 & Option 2 Schemes
Dr. Charles R. Drew – 2011 – Option 2 Scheme
Dr. Charles R. Drew – 2011 – Conceptual Design/Feasibility Cost Estimate Report (Option 1)
Dr. Charles R. Drew – 2011 – Conceptual Design/Feasibility Cost Estimate Report (Option 2)
Additional information is available in the Multiple Sites section below.
Education Center (2014, 2011, 2006)
Education Center – 2014 – Feasibility Study
Education Center – 2011 – Feasibility Study
Education Center (Planetarium) – 2006 – Building Information Report
Glebe – 2011 – Estimate of Probable Cost
Additional information is available in the Multiple Sites section below.
Gunston – 2016 – Capacity Study
APS – 2014 – Divisionwide Utilization and Occupancy Study
Gunston – 2014 – Site Diagrams
Gunston – 2014 – Conceptual Design/Feasibility Cost Estimate Report
Hoffman-Boston – 2011 – Illustrative Site Plan
Hoffman-Boston – 2011 – Conceptual Design/Feasibility Cost Estimate Report
Additional information is available in the Multiple Sites section below.
Jamestown – 2011 – Conceptual Design/Feasibility Cost Estimate Report
Jamestown – 2011 – Site Diagrams
Jefferson-Alice W. Fleet (2014, 2013, 2012, 2011)
Fleet (Jefferson) – 2014 – Concepts A, B, C, and D (New School)
Fleet (Jefferson) – 2013 – Site Plans (New School)
Fleet (Jefferson) – 2011 – Diagrams (New School)
Fleet (Jefferson) – 2011 – Conceptual Design/Feasibility Cost Estimate Report
Jefferson – 2012 – Parking Concept #1 Design
Jefferson – 2011 – Illustrative Plan
Jefferson – 2011 – Conceptual Design/Feasibility Cost Estimate Report
Kenmore-Carlin Springs (2019, 2016, 2014, 2012, 2011)
APS – 2019 – Design Studies per School Board CIP Direction
Kenmore – 2016 – Capacity Study
Kenmore-Carlin Springs – 2014 – Conceptual Design/Feasibility Cost Estimate Report
Kenmore-Carlin Springs – 2012 – Transportation Assessment (Draft)
Kenmore-Carlin Springs – 2011 – Scheme A & Scheme B
Kenmore-Carlin Springs – 2011 – Conceptual Design/Cost Estimate Report (Scheme A-Carlin Springs)
Kenmore-Carlin Springs – 2011 – Conceptual Design/Cost Estimate Report (Scheme A-Kenmore)
Kenmore-Carlin Springs – 2011 – Conceptual Design/Cost Estimate Report (Scheme B)
Long Branch – 2006 – Building Information Report
McKinley (Future Arlington Traditional) (2011, 2006)
McKinley – 2011 – Cost Estimate
McKinley – 2006 – Building Information
Nottingham – 2011 – Cost Estimate
Additional information is available in the Multiple Sites section below.
Oakridge – 2014 – Conceptual Design/Feasibility Cost Estimate Report
Oakridge – 2011 – Site Plan (Lower Level)
Oakridge – 2011 – Conceptual Design/Feasibility Cost Estimate Report
APS – 2019 – Design Studies per School Board CIP Direction
Randolph – 2006 – Building Information Report
Reed (Future Cardinal) (2014, 2012, 2011, 2006)
Reed – 2014 – Conceptual Design/Feasibility Cost Estimate Report
Reed – 2012 – Site Plan (First Floor)
Reed – 2012 – Conceptual Design/Feasibility Cost Estimate Report
Reed – 2011 – Conceptual Design/Feasibility Cost Estimate Report
Reed – 2006 – Site Information Report
Additional information is available in the Multiple Sites section below.
Swanson – 2014 – Conceptual Design/Feasibility Cost Estimate Report
Swanson – 2014 – Site Diagrams
Taylor – 2011- Conceptual Design/Feasibility Cost Estimate Report
Williamsburg-Discovery (2015, 2014, 2012, 2011, 2006)
Williamsburg – 2015 – Capacity and Expansion Studies
Williamsburg – 2014 – Diagrams
Williamsburg – 2014 – Ground Floor Diagrams
Williamsburg – 2014 – Conceptual Design/Feasibility Cost Estimate Report
Williamsburg-Discovery – 2012 – Transportation Assessment (Draft)
Williamsburg – 2011 – Conceptual Design/Feasibility Cost Estimate Report
Williamsburg (Discovery) – 2011 – New Elementary School Diagrams
Williamsburg (Discovery) – 2011 – Conceptual Design/Feasibility Cost Estimate Report
Williamsburg – 2006 – Building Information Report
Multiple APS Sites
Madison-Reed – 2012 – Site Plans
Madison-Reed – 2012 – Building Information
Abingdon-Glebe-Nottingham – 2011 – Feasibility Study
Abingdon-Glebe-Nottingham – 2011 Cost Estimate Report
Abingdon-Glebe-Nottingham – 2011 – Cost Estimate
Drew-Hoffman Boston – 2011 – Feasibility Study
Lubber Run Community Center (2014, 2012, 2008)
Lubber Run – 2012 – Scheme A and Scheme B Diagrams
Lubber Run – 2012 – Conceptual Design/Feasibility Cost Estimate Report (Scheme A, Option 1)
- Note that the cover page of the report above says “Kenmore Middle School” but that the information in the report is for Lubber Run as indicated on later pages.
Lubber Run – 2012 – Conceptual Design/Feasibility Cost Estimate Report (Scheme B, Option 1)
Lubber Run – 2008 – Facility Condition Assessment
Madison Community Center (2012, 2010)
Madison – 2012 – Option 1A, 1B, & 2 Diagrams
Madison – 2012 – Option 3 Diagrams
Madison – 2012 – Option 1A, 1B, & 2 Square Feet
Madison – 2012 – Conceptual Design/Feasibility Cost Estimate Report (Option 1A, 1B, 2, & 3)
Madison – 2010 – Feasibility Study
Additional information is available in the Multiple Sites section below.
APS – 2019 – Design Studies per School Board CIP Direction
Quincy (Buck) – 2018 – Diagrams
Quincy (Buck) – 2018 – Project Comparative Construction Budget Cost Summary
Quincy (Buck) – 2018 – Buck Swing Space Renovation to High School Program