Full Menu
Search

Solar Panel Installation Wraps Up at Kenmore, Washington-Liberty

Crews recently wrapped up installing solar panel arrays at Kenmore Middle School and Washington-Liberty High School. The installation is part of the partnership with Sun Tribe Solar.

Each school’s array will generate over 500 kWDC of power when it goes live at the end of May. Arrays have also been installed at Fleet and Tuckahoe elementary schools.

Site kW DC Annual PV
Generation
(kWh)
%PV offset PV Roof Area
Kenmore 576.8 795,539 27 53,088
Washington-Liberty 536.4 727,572 11 45,335
Fleet 582.2 739,441 100 33,810
Tuckahoe 36.5 49,220 7 4,682

More News in News Release

Arlington Public Schools to Participate Summer Meals Program

Arlington Public Schools is participating in the Summer Food Service Program. Meals will be provided to students ages 18 and under on a first come, first serve basis, from July 5-Aug. 1 at Carlin Springs Elementary School (5995 5th Road S.).

School Board Appoints Principal of Arlington Science Focus Elementary School

At its June 22 meeting, the Arlington School Board appointed Gina Miller as Principal of Arlington Science Focus Elementary School. 

School Board Appoints Principal of Claremont Immersion Elementary School

At its June 22 meeting, the Arlington School Board appointed Dr. Liza Burrell-Aldana as Principal of Claremont Immersion Elementary School.